The project for reconstruction of the playing field of the Hristo Botev Stadium in Blagoevgrad includes the following works:
- Design and installation of a new drainage system;
- Design and installation of an automated irrigation system;
- Design and construction of a 100 cubic-meter water storage facility and integrated pumping station;
- Design and installation of a 1500-meter Ø 75 water supply line connecting the storage facility and the field;
- Re-sodding including excavation and fertilizing.